Removal of an old up-and-over door and installation of a motorised sectional garage door on avenue Lucien Grelinger in Rungis (94): tracks, operator rail and motor fixed to the ceiling.
Shasama Fermetures worked on avenue Lucien Grelinger, in Rungis, on a garage fitted with an old up-and-over door. That door was dismantled and replaced with a new motorised sectional door: operator rail welded and fixed to the ceiling, motor in place, door photographed open and then closed.
What was carried out on site
- Dismantle the garage’s old up-and-over door
- Fit the new sectional door and its tracks
- Weld and fix the operator rail bracket to the ceiling
- Install the motor and its rail on the garage ceiling
- Run the new door through opening and closing
Intervention facts
- Location
- Rungis · Rungis (94)
- Closure type
- Motorised sectional garage door
- Specific intervention
- Removal of an up-and-over door and installation of a motorised sectional door.
- Client profile
- Private garage
- What we did
- Removal of an old up-and-over door and installation of a motorised sectional garage door on avenue Lucien Grelinger in Rungis (94): tracks, operator rail and motor fixed to the ceiling.
- Project category
- Installation
- Project photos
- 5 photographs
From inspection to return to service
This sequence describes our working method for this type of intervention. Job-specific operations are listed separately when they have been confirmed.
Inspect and diagnose
Review the closure, its sticking points and the site constraints before any action is taken.
Work methodically
Carry out the agreed actions with a protected work area suited to the equipment.
Adjust the components
Check alignment, guides and the settings needed for smooth, regular travel.
Test the closure
Check movement, stops and overall behaviour before returning the access.
The matching service, explained step by step: Garage door installation
All our work on this type of closure: Residential doors
What to monitor afterwards
After installation, the first operating cycles provide useful reference points for alignment and consistency.
- Visually check that the guides stay clear and the curtain lowers without drifting.
- Avoid impacts and deposits at the foot of the closure, especially during the initial handover period.
- Request an inspection if play, rubbing or a change in travel appears.
Project report
Every stage in pictures
5 captioned on-site photographs